Monday, January 20, 2014

We've got mud on our walls...

It took four guys twelve hours to fill cracks, tape, put up corner-bead, and put a coat of mud on everything.
The crew left their beast of a heater here to keep the temperature warm while the mud dries, and we've got our dehumidifier running to try to help suck the moisture from the air.



I didn't think all our crazy, crooked angles would looks so good, but the lead guy took his time with it, and everything looks amazing. There is no way Chris could have made it look this good.

No comments: